How to Compare Two Proposed Service Days Before Booking

Compare two capacity scenarios with Daylane's free calculator, keeping assumptions visible and checking the actual route, access and scope before confirming work.

Daylane week schedule with field Jobs, Customers and service Locations
A real Daylane schedule with sanitised fictional example data.

Save one set of capacity assumptions, change the inputs for a second plan and compare the results before booking. A larger estimated Visit count is only useful if the actual work, access and journeys fit. Keep the reason for each changed assumption visible alongside the result.

Choose the decision you are comparing

The fictional example keeps the working day and daily reservations the same, then compares shorter nearby work with longer services. It uses an average per-Visit estimate, so it is an initial capacity comparison rather than a route optimiser.

Illustrative two-plan capacity comparisonScroll for more columns →
AssumptionPlan APlan B
Working day480 minutes480 minutes
Breaks + admin/final travel + recovery105 minutes105 minutes
Service + setup + inbound travel per Visit60 + 10 + 20 = 90 minutes90 + 10 + 20 = 120 minutes
Available minutes375375
Estimated whole Visits43
Additional unallocated time15 minutes15 minutes

Use the calculator's comparison controls

Enter the first plan and choose Save as Plan A. Then edit the inputs for Plan B. The comparison shows the saved assumptions and the current result together; Clear comparison removes the saved plan. Inputs stay in the page and are not saved to your account.

If the current inputs are invalid, correct them before interpreting a comparison. A blank field is missing information, not a zero-minute task.

Check the real sequence before choosing

Compare the actual Visit lengths, fixed access, travel order and customer commitments for the preferred plan. Two days with equal estimated capacity can have very different practical constraints.

Do not improve the result by removing a recovery allowance or shortening travel without a reason. Record why the chosen plan is workable, then schedule and confirm the actual Visits through the normal workflow.

Compare plans in the free Job capacity calculator

Sources and scope

An original operational guide from the Daylane team at Blu Mint Digital. Scenarios, durations and message wording are illustrative planning examples, not customer results or industry benchmarks. Product references were checked against the Daylane implementation on 5 September 2026. Adapt the workflow to your service, customer agreements and working conditions.

How we write and maintain our guides. Free templates and planning tools.

    Back to the guide library

    Put the next Job in a clearer place.

    Start with one user and unlimited manually scheduled Jobs.

    Start 14-day trial